🇹🇷 Düzce, Türkiye
Gönenç Alüminyum
Press-exit handling and conveyor / run-out line at the Düzce plant — 1,800 tonf.
Installed line
Installed equipment
Installed equipment
- Conveyor / run-out line — 1,800 tonf
About this project
About this project
Press-exit handling and conveyor / run-out line at the Düzce plant — 1,800 tonf. The line was installed with ADA TRUSTAR’s engineering and project coordination, and commissioned within the scope of handling / conveyor.
The list below states the equipment installed at this plant exactly as recorded in the portfolio:
- Conveyor / run-out line — 1,800 tonf
The 1 photographs on this page were taken on site during installation and commissioning. If you share your capacity, alloy and profile range for a similar line, we prepare a technical specification with the same approach.
ADA TRUSTAR scope
Line layout preparation, run-out and conveyor sizing matched to the press capacity, equipment supply, installation and commissioning follow-up.
Similar projects
Similar projects
This record was imported from the ADA TRUSTAR project portfolio (ref. ATX / 2025). The photographs were taken on site.
Request a Quote
Discuss your project with an engineer
Tell us your alloy, target capacity and profile range. We prepare a technical specification, compare manufacturer offers and set out the scope boundaries in writing before any order.

