🇹🇷 Gebze, Kocaeli, Türkiye
Durlaline Alüminyum
Vertical powder-coating line at the Gebze, Kocaeli plant — 1,500 t/month.
Installed line
3 Site photograph · click to enlarge
Installed equipment
Installed equipment
- Vertical powder-coating line — 1,500 t/month
About this project
About this project
Vertical powder-coating line at the Gebze, Kocaeli plant — 1,500 t/month. The line was installed with ADA TRUSTAR’s engineering and project coordination, and commissioned within the scope of surface finishing — powder coating.
The list below states the equipment installed at this plant exactly as recorded in the portfolio:
- Vertical powder-coating line — 1,500 t/month
The 3 photographs on this page were taken on site during installation and commissioning. If you share your capacity, alloy and profile range for a similar line, we prepare a technical specification with the same approach.
ADA TRUSTAR scope
Line capacity defined against the monthly tonnage target, chemical pre-treatment and oven configuration written into the specification, installation and commissioning follow-up.
Similar projects
Similar projects
This record was imported from the ADA TRUSTAR project portfolio (ref. ATX / 2025). The photographs were taken on site.
Request a Quote
Discuss your project with an engineer
Tell us your alloy, target capacity and profile range. We prepare a technical specification, compare manufacturer offers and set out the scope boundaries in writing before any order.

